Offshore Wind Farm Temporary Scaffolding
This temporary edge protection was required by BGB Scaffolding Ltd on one of the Renewable Green Energy sites that we operate on.
This temporary edge protection was required by BGB Scaffolding Ltd on one of the Renewable Green Energy sites that we operate on.
This scaffolding was another bespoke design. This project was to enable safe working access for the securing and protection of the port and Interlink cables.
This project enabled Bgb Scaffolding Ltd to work with the Altrix System for erecting Temporary Roofs. The property had been suffered serious damage to fire and required a fully enclosed scaffolding to allow for a whole new roof construction, chimney stacks to be rebuilt, fascias, soffits and rain water goods.
This stillage was designed by BGB Scaffolding Ltd and manufactured by RMI Engineering Ltd.